To guarantee effective solar absorption, the solar collectors must be cleaned on a regular basis to get rid of any dust or debris.
It is necessary to verify the system’s pressure to make sure it is functioning within the ideal range.
Checking the system’s temperature can help ensure that everything is operating as it should.
It is important to check the control cards to make sure that they are working and connected correctly.
Testing safety valve: Testing the safety valve guarantees that should pressure building occur, it will operate as intended.
It is necessary to evaluate the gauges to ensure their accuracy and dependability.
Pipeline valves should have their operation examined to make sure there are no obstructions or inefficiencies.
To keep the system’s circulation functioning properly it is critical to check the pump.
One way to stop energy and water waste in the system is to thoroughly inspect it for leaks.
It is important to check the tank to make sure it is properly operating and holding warm water in the right place.
Evaluating the controller’s performance guarantees appropriate system administration.
Thermosiphon Systems
Half Yearly
To guarantee effective sunlight absorption, the solar collectors must be cleaned on a regular basis to get rid of any dust or debris.
One way to stop energy and water waste in the system is to thoroughly inspect it for leaks.
An assessment of functionality of thermostat.
Examining the heating component.
Yearly
Internal cleaning tank
Replenishing the closed loop if required
Calibration of safety valves
AMC Solar PV
AMC for Solar PV per month
Cleansing solar panels every two months to guarantee maximum performance.
For smooth operation, perform routine inverter checks (visual observation)
Comprehensive examination of the wires to find any possible problems (visual observation)
Combiner Box inspection to verify correct operation (visual observation)
If necessary, undertake a battery assessment to ensure optimal performance.
Through examination and reporting grounded in visual observations.
AMC for Solar PV per year
Cable verification of continuity
Verification of the Meter and Distribution Box
Examining junction boxes
Extensive inspection of every cable
Electrical Evaluation of Inverters and combiner units
A thorough analysis of the site and a review report on the plant’s performance and total energy generation.
AMC Calorifier
Monthly AMC for calorifier per month
Verification of temperature
Evaluation of pressure
Examining gauges
Inspection of heat exchanger and heating element
Checking the operation of the safety valve
Evaluation of quality of water
Examining of control panel
Annual AMC for calorifier per month
Adjustment of every safety valve
Sensor continuity check
Analyzing the controller and cleaning tank
Cleaning of heat exchangers and heating elements
Balance of the system
A thorough site analysis as well as review report on overall performance of plant and energy generation
AMC Chiller
AMC for chiller per month
Checking for leaks in the refrigerant
Checking power supply
Analyzing heat exchanger
Evaluation of valves
High and low pressure measurements
Verification of temperature
Verify the oil in compressor
Examination of pump
Inspection of pipes
AMC for chiller per year
Evaluation of compressor wear and tear
Assessment of heat exchanger deterioration
Examination of filter in dehydrator
Verification of dielectric rigidity
Inspection of connection in the pipes
Examine for violations.
Evaluation of antifreeze concentrations
Water quality verification
Examining the fan flow
Inspection of electrical connections and controls
Checking and adding more oil as needed
AMC Steam Boiler
AMC for Steam Boiler per year
Evaluation of temperature
Verification of pressure
Security examines the operation of valve, inspection of control valves visually checking for any issues with the system.
Checking the feed water tank (also called Deaerator tank)
Examining the condensate tank
Assessment of condensate pumps
Examining the blowdown vessel
Examination of boiler
Examination of burner
Checking the gauges
Analysis of water quality (by 3rd party)
Pressure evaluation for pressure relief valves.
Validation of pipeline valve functionality
If necessary, perform a flash vessel check
AMC for Steam Boiler per half year
Cleaning of strainer pump
Cleaning of control panel
Inspection and cleaning of burner
Inspection and cleaning of chamber
AMC for Steam Boiler per half year
Burner optimization (if necessary)
Boiler tube cleaning
Analysis of Flue Gases
Complete replacement of boilers and burners
Sensitivity evaluation for relationships
Calibration of Safety Valve
Certification by a third party for compliance with Boilers
Evaluation of site and delivery of a comprehensive report on total energy production and plant efficiency
AMC Heat Pump
AMC for Heat Pump per month
Check for leaks of refrigerants
Make sure there is enough power
Examine heat exchanger
Visually checking for any issues with the system
Check valves for correct operation
Monitor both high and low pressure measurements
Verify temperature levels
Check levels of compressor oils
Evaluate pump’s functionality.
Examine piping system
Check controller’s operation
Verify the flow switch operating properly
AMC for Heat Pump per year
Check compressor for wear and tear indications
Examine heat exchanger for deterioration
Check the pipe connections condition
Determine if anti-freeze is there
Evaluate the quality of water
Check electrical control and connections
A thorough evaluation report and assessment of overall energy production and operational efficiency of plant
You have the right to up to four free emergency visits per year for mechanical support.
AMC Hot Water Boiler
AMC for Hot Water Boiler per month
Visual check for malfunctions in system
Verification of temperature
Assessment of pressure
Saety valve inspection
Examination of control valve
Assessment of boiler control panel
Evaluation of master controller
Inspection of closed loop systems
Verification of circular pumps
Examination of burner
Inspection of gas valve
Validation of gas station pressure
Assessment of natural draught chimney
Inspection of gauges
AMC for Hot Water Boiler per half year
Cleaning of strainer pump
Cleaning of control panel
Cleaning and inspection of burner
Boiler tubes cleaning
Inspection of chamber
AMC for Hot Water Boiler per Year
Thorough redesign of boiler and burner
Sensitivity evaluation for connections
Safety valve calibration
Flue gas analysis
Boiler compliance certification from an impartial third party
Site evaluation and delivery of an extensive report on overall energy generation and plant performance
You have the right to up to 4 free emergency visits per year for mechanical support.
AMC Air Conditioning
AMC for Air Conditioning per month
Checking for leaks in refrigerant
Checking power supply
Evaluation of heat exchangers
Inspection of valves
Low pressure and high-pressure measurements reading
Verification of temperature
Compressor oil level evaluation
Pump validation
Examining pipelines
AMC Cooling Tower
AMC for cooling tower per month
Examining water treatment report for biological contamination visually and consulting on it.
Tension evaluation of belts
Analyzing fan blades
Examination of Sheaves and Bushings for corrosion
Examining fan screens
Cleaning the fan screens, and intake of louvers of dirt or debris
Inspection of fan shaft and fan cylinder
Evaluation of fill media for heat transfer
Examining spray pattern and water distribution system and cleaning nozzle if needed
Examining mechanical vibration switch enclosure for moisture and loose wiring
Complete visual examination of equipment, with report submission following each service
AMC for cooling tower per half year
Fan shaft bearings are lubricated
Motor pulley hardware inspection, evaluation, and alignment
Lubricating and inspecting sliding motor base
Bearing flingers, bearing locking collar, and torque seal disc verification and adjustment
Examining and modifying alignment of fan shaft
Inspection and cleaning of pipeline for bearing lubrication
Drift eliminator’s inspection and adjustment
AMC for cooling tower per year
Vibration switch sensitivity fine-tuning
Electronic water level controller and solenoid valve inspection and cleaning
Evaluation of site and delivery of a comprehensive report on total energy production and plant efficiencies
Cleaning of fills
AMC for Solar Streetlight
AMC for solar street light per month
Verify lamp status
Examine diffuser condition
Examine PV panel and clean it if necessary
Evaluate health of battery
Check control systems.
Verifying wiring and output voltage
AMC for solar streetlight per year
Examine brackets for corrosion and clean them as needed
Examine controller to ensure correct operational performance
Check the sensitivity of wiring
Analyze the site and produce detailed report on the plants performance and overall energy generation